◇ Rocker arm components assemble
◇ Integrated NDT technologies
◇ Multi-working station co-work mode,including staking ,assembling and sorting.
◇ Self-diagnosis system
◇ production data storage and analysis,communication with ERP system.
◇ Full automatic assembly and customized design
Main data | |||
Overall Equipment Effectiveness | ≥85% | Measure portions OEE | ≥90% |
variables station GR&R | ≤10% | Attributes station GR&R
| 100% |
Running noise | ﹤85dB | Change type time | ≤120min |
Cycle time | ≤3S/PCS | Proper assembly Inspection rate | ≥99.8% |